- Owner: First American
- Contractor: FBE Construction
- Date Completed: 05/07
- Contract: $12,400,000
The data center was in a separate building supported by the central plant building. The data center has around 65,000 square foot of raised floor. This building has 12 static PDU’s with 50 remote power panels supporting 450 APC data racks. Project included:
- Installation of 4 new 2 Megawatt generators
- Russelectric parallel gear with closed transition capabilities
- multiple transfer switches
- 4 new 4000 amp 480 volt service entrance switchgear
- 4 new 1000kva UPS’s