HBK Data Center

  • Owner:
  • Contractor: Spaw Maxwell Construction
  • Date Completed: 07/08
  • Contract: $5,200,000

Installation of 1 Mega watt Generator, 1 -1600 amp russelectric isolation Bypass ATS, 3-APC Symmetra 500KW UPS systems Which included PDU unit , in row coolers, and data racks. At the time this system was 1 of 3 installed in the Nation.